2020-08-19 Integration Meeting Minutes

Date & Time

August, 19th, 2020; 9pm PST

Agenda

  • Release

  • Infra

  • Docs

  • Misc

Minutes

Release:

  • Aluminium . Aug 3, 2020 is Aluminium code freeze

    • last 6 autorelease has all failed

      • acutally, the last autorelease passed the build, but some signing cert failure makes the jenkins job mark as aborted

        • @Thanh Ha will open a ticket with LF to get the signing cert fixed

    • 2 blocker bugs

      • NETCONF-716 will be lead by @JamO Luhrsen

      • BGPCEP-919 needs an update from @Venkatrangan Govindarajan

    • 2 bugs on INTTEST project that we can hopefully fix before the release

  • Sodium SR4 is hopefully on track for the end of August Aug 21, 2020 for SR4 release SR4 checklist

    • looks like the last 3 failing jobs might be intermittent failures and not regressions. @JamO Luhrsenwill double check today and if all is well, we can release SR4 this week

  • Silicon release started

    • the vote for the schedule has passed

  • Magnesium SR2 is out and docs are updated. SR3 will be next and the final Mg release in mid-November

Infra:

  • Last week our CSIT jobs were failing because of some missing certificate. That was fixed last week, but now we realize that
    our autorelease jobs are failing for a similar issue. A new ticket is now open.

    • our tooling was not notifying us that the jobs were failing because the real work (the build) was just fine. This was
      yet another infra issue.



Docs:

  • some recent docs patches were abandoned, but we might restore those and see if we can finish

Misc:

  • netvirt jobs have some new python dependency failures that @Srinivas Rachakondais working on. but stacking is failing



Action Items