2020-06-10 Integration Meeting Minutes
Date & Time
June, 10th, 2020; 9pm PST
Agenda
Release
Infra
Docs
Misc
Minutes
Release:
Aluminium with some initial issues in controller CSIT
9 issues reported, but down to 4 left in just 1 day
autorelease is having problem in things like netvirt and genius and
not sure status on that
Magnesium is stable in autorelease and SR2 is coming in early July
stable/sodium still locked, but we may want docs patches to get in
Anil Shashikumar Belur will unlock the docs project so we can keep making
docs changesno news on anything SR4 at this point
Infra:
initial patch to change netvirt jobs to match matrix to reduce job frequency
Lispflowmapping has a performance job that uses a high cost VM. The project
no longer maintains or manages that job. We can remove it here.
Docs:
Misc:
global-jjb v0.55.0 release notes not there
need to manually run the rtd-merge job in odl jenkins for those release notes to get updated
sodium release notes job not working
Anil Shashikumar Belur looking at it, using a ticket opened by Daniel De La Rosa
problem is that we are not getting a Change-ID in the commit message
assigned to Thanh Ha
Action Items
JamO Luhrsen to merge sodium docs patches