Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Contents

Table of Contents
outlinetrue

Design Overview

Genius contains four main components:

  1. Interface Manager
  2. Tunnel Manager
  3. Aliveness Monitor
  4. ID-Manager

Contents

Table of Contents
outlinetrue

Design Overview

Genius contains four main components:

  1. Interface Manager
  2. Tunnel Manager
  3. Aliveness Monitor
  4. ID-Manager

these modules are developed as karaf features which can be independently installed. However, there is some dependency among these modules. The diagram below provides a dependency relationship of these modules.

...

Follwoing diagram provides a toplevel architecture of Interface Manager.

 

In addition to these datamodels, it also implements several RPCs for accessing interface operational data. Details of these datamodels and RPCs are described in following sections. Interface Manager also uses ODL Inventory and Topology datastores to retrive southbound configurations and events. As described above Interface Manager uses other Genius modules for its operations. It mainly interacts with following other modules-

Modules used by InterfaceManager

...

Introducing Egress Service Binding

Currently Interface Manager supports service binding on port ingress only. However, there are services that need packet processing on the egress, before sending the packet out to particular port/interface. To accommodate this, interface manager will be enhanced to support egress service binding also. This will be achieved by introducing a new “egress dispatcher table” at the egress of packet pipeline before the interface egress groups.

Image Modified

On different application request, Interface Manager returns the egress actions for interfaces. Service modules program use these actions to send the packet to particular interface. Generally, these egress actions include sending packet out to port or appropriate interface egress group. With the inclusion of the egress dispatcher table the egress actions for the services would be to

...

Following gallery contains sequence diagrams for different IFM operations -Image Removed


Image Added         Image Added          Image Added         

     Removal of Tunnel Interface When                        Removal of Tunnel Interfaces                                  Updating of Tunnel Interfaces   
     OF Switch is Connected                                          in Pre provisioning Mode                                        in Pre provisioning Mode                       
Image Removed           Image Removed

                   Removal of Tunnel Interface When                        Removal of Tunnel Interfaces     


Image Added         Image Added              Updating of Tunnel Interfaces   
     OF Switch is Connected  Image Added

  Creation of tunnel-interface when OF switch is          Creation of vlan interface in pre                               Creation of vlan interface when
  connected and PortName already in OperDS             provisioning mode                 
  in Pre provisioning Mode                                    in Pre provisioning Mode      switch is connected



Image Added            Image Added        Image Added

deletion of vlan interface in                                                deletion of vlan interface when          Image Removed           Image Removed           Image Removed  Creation of tunnel-interface when OF switch is  node connector added_updated 
pre provisioning mode         
Creation of vlan interface in pre                               Creation of vlan interface when
  connected and PortName already in OperDS           provisioning mode       switch is connected                                                switch is connected
Image RemovedDCN handling




Image Added              Image RemovedImage Added        Image Removeddeletion of vlan interface in    Image Added

 node connector removed                                                 deletion  updation of vlan interface wheninterface in pre                            updation of vlan interface when
 DCN handling               
  node connector added_updated 
pre provisioning mode                                                     switch is connected   provisioning mode                                                    DCN handlingswitch is connected